We are informing you about the construction of the residential complex "Shchaslyvyi" (Lviv) final stage.
The builders performed the following works during the last time:
•installation of horizontal formwork of the floor slab above the parking lot; the twisting of the floor slab reinforcement has begun;
•masonry partitions for storerooms in the basement;
•pouring screed on 5-8 floors;
•arrangement of the wet facade of the chimneys on the roof (reinforcement and texture application);
•the arrangement of the ventilated facade is completed.
The following tasks have been started (or will be started soon):
•concreting of the floor slab, parapet and columns in the parking lot;
•arrangement of screed on 2-5 floors;
•drilling holes for laying gas pipeline pipes;
•painting the facade of chimneys.