We are pleased to present an update from the construction site of the RC “Shchaslyvyi” (Lviv) in Bihova Street.
Among the works that have been completed in full or in part:
• concreting of the bowl for the fountain;
• finishing of the floor and walls of the basement corridors has been completed;
• installation of equipment for domestic and fire pumping stations in the building has been completed;
• cold water pipelines were laid to the premises of the 1st floor;
• installation of doors in the basement to the pump room, electrical room, and fan room;
• landscaping works along the building to the entrance to the hall and from the end of the building;
• tiling of the facade of the 1st floor has been completed;
• finishing of the hall, installation of mailboxes;
• hanging bars in the places of installation of fire valves;
• cleaning of the premises of the public usage places and the hall.
The next planned stages of work include:
• improvement works: sidewalk around the building, extension of the road behind the building;
• installation of smoke removal, ventilation, and air supply fans on the roof;
• waterproofing works in the fountain bowl, laying of networks to the fountain;
• installation of floor numbering in elevator halls and stairwells;
• installation of decorations in the lobby;
• installation of fire system equipment.